Case story archive

PrintIncrease text size
Below you will be able to read stories previously featured in the case story section.


 

Chose subject  

Case stories about: Energy

New building project scrutinised
Vacuum pumps

Without the proper consideration, a building project such as Lundbeck’s coming activity centre containing sports facilities and swimming pool could cause a surge in energy consumption. But this is not likely to happen at Valby. From the first drawings, keeping the energy consumption under control has been part of the work, and this applies in every aspect from selection of materials to dimensioning of the hot water supply and ventilation systems, according to Christian Saxer from Engineering.

“For instance, wrong building materials could cause high cooling requirements. And cooling is one of the most energy-consuming processes. Also, we must avoid solutions requiring heating and cooling at the same time. That would be pure ’energy murder’.”

Energy scrutinising of major building projects has been applied before with good results, e.g. when the packing department was refurbished some years ago. Today, all projects – large and small – are assessed on an energy conscious basis and usually savings can be achieved by choosing one solution over the other.

Read more about our HS&E activities in Valby in our HS&E report for Valby

H. Lundbeck A/S
Ottiliavej 9
DK-2500 Copenhagen Valby
Tel +45 36 30 13 11
Fax +45 36 30 19 40
information@lundbeck.com
Contact us
The specialist in psychiatry and pioneer in neurology
Disclaimer & Privacy statement